OctaVertex Media Logo
Free Template

Post-Launch Experiment Plan

One experiment a week. Compounding, not chaotic.

Post-launch growth is a queue of small tested bets, not one big redesign.

1/week
experiment cadence that compounds

The journey, step by step

Where the work concentrates

  • Build the backlog4
  • Design the test4
  • Run it clean4
  • Decide and log4
01

Build the backlog

  • Turn every funnel drop-off into an experiment idea.

  • Turn every repeated support question into one.

  • Write each as: change X, expect Y to move.

  • Score ideas by impact, confidence, ease. Rank the list.

02

Design the test

  • One variable per experiment. Two changes prove nothing.

  • Define the success metric before you ship.

  • Set the run time up front — one to two weeks.

  • Small traffic? Prefer bold changes over subtle tweaks.

03

Run it clean

  • Ship Monday. Mid-week launches muddy the data.

  • Don't peek daily and don't stop early on excitement.

  • Log anything unusual that week — sales push, outage, PR.

  • Keep the rest of the product frozen during the run.

04

Decide and log

  • Compare against the metric you pre-registered. No moving goalposts.

  • Winner ships to everyone. Loser gets written up anyway.

  • Keep a one-line log: change, result, decision.

  • Feed learnings back into the backlog ranking.

Want this done for you?

We run this exact process on every build. 11 platforms shipped, 7 live in production.

Book a call